This project was situated within world heritage rainforest in the Crater Lakes National Park, Atherton Tablelands, Far North Queensland. CivilTeam was contracted to design and construct the road, bus and car park infrastructure for the Lake Eacham Day Use Area.
This project delivered a successful pavement upgrade at the Domestic Apron Bay 23 for the Cairns Port Authority. Despite being faced with several significant issues, the project was completed eight weeks ahead of schedule.
The works in this project were undertaken concurrently with the Braunstone Rail Loop Extension (Project 7). CivilTeam added value on both projects due to work staged and completed simultaneously, providing cost savings to the client.
For this project CivilTeam was responsible for preparatory civil works for the new railway extension loop at Braunstone, Grafton, NSW.
This project included the construction of roadworks and drainage for the Moranbah Power Station. The contract required the construction of a site access roadway from the Goonyella Road to the Moranbah Power Station site.
This project delivered earthworks, concreting and concrete kerb construction as part of the stormwater drainage improvement program for the remote township of Goodooga, NSW.