330 KV Overland Power Transmission Line
Description
CivilTeam became involved in this project when the client was faced with the challenge of drilling through rock to provide substantial foundations for the transmission towers.
They were considering having to blast the rock when we approached them with an innovative and cost-effective solution. We were subsequently contracted to provide specialist excavation equipment to dig through the rock.
Works
- Provision of specialist plant
Challenges
- Excavation in rock
Our Management
CivilTeam provided specialist rock excavation equipment at competitive rates for the client, and at very short notice.
Value Adding
One of CivilTeam’s strengths is formulating innovative and cost-saving solutions. CivilTeam was made aware of the difficulties the client was facing so we approached them with a problem-solving proposition.
Our solution was accepted and subsequently used for the remainder of the project. This not only eliminated a technical difficulty the client was facing, but was cost-saving for them as well.





